Skip To Content

Media Contact:

press@flatironcorp.com
720-494-8032

Subscribe to our In the News feed to receive the latest Flatiron media coverage:

Flatiron In The News

 

Subscribe to our Press Announcements feed to receive the latest Flatiron press releases:

Flatiron Press Announcements


Subscribe to Structurally Speaking to receive quarterly project and employee news:

press@flatironcorp.com

Media Coverage

Page 1 | 2 | 3 ... 8 | 9 | 10 ... 21 | 22 | 23      View Archives

Aug 31, 2012

Creating a Culture of Safety

Rodney Oliver, vice president of environment, health and safety at Flatiron spoke with AGC Constructor about reducing safety incidents related to OSHA's Focus Four hazards. Read More //
Aug 30, 2012

Airport Green Build 50 Percent Complete

About a year from now, San Diego's Lindbergh Field will have a fully functional Terminal 2 and improved access to the entire facility. Construction work to expand the airport is more than 50 percent complete.The project is a joint venture between Turner Construction, PCL Construction Services Inc. and Flatiron Construction Corp. Read More //
Aug 11, 2012

Why I Helped Build a Bridge in El Rodeo

A blog post from Teresa Gunnarsen, business manager for Flatiron in Drayton Valley, Alberta, chronicling her recent experience with Bridges to Prosperity in Nicaragua.  Read More //
Aug 6, 2012

Chino Teen gets Real-World Engineering Experience Helping Build State Route 91

Victor Zeman participated in Flatiron's Build-A-Bridge program, winning $3,500 in scholarship money and a summer internship at the firm's Chino office. Read More //
Aug 1, 2012

High-Tech Sensors Track Performance of 35W Bridge

Five years after the Interstate 35W bridge in Minneapolis collapsed into the Mississippi River, officials say the new replacement bridge is performing well. They can say that with confidence because the bridge is fitted with hundreds of high-tech sensors that track how the span reacts to things like weight on the bridge, vibration and temperature. Researchers say the data they collect from the span could change how bridges are designed in the future. Read More //
Jul 27, 2012

Bridge Getting Decked Out

The twin spans that have formed the Santa Maria River Bridge since 1962 are now joined, and a new roadway deck is being laid.  Read More //
Jul 26, 2012

Borden Road Bridge Will Fill Gap on Key San Marcos Roadway

Late next spring, San Marcos residents should have complete access to a major east-west thoroughfare, whether they are traveling by car, bike or on foot.City officials broke ground last week on the $5.6 million Borden Road bridge project, which will connect the missing portion of the roadway between Woodward Street and Twin Oaks Valley Road. Read More //
Jul 25, 2012

NYSDOT Recognized by FHWA for Outstanding Lake Champlain Bridge Project

New York State Department of Transportation (NYSDOT) Commissioner Joan McDonald today announced the receipt of the 2012 Transportation Planning Excellence Award for outstanding work on the project to replace the Lake Champlain Bridge spanning the lake to connect Crown Point, New York, and Addison, Vermont. The honor was bestowed jointly to New York and Vermont for the project, which was funded by both states and managed by NYSDOT. Read More //
Jul 23, 2012

Bridge Construction Moving Along

Flatiron has made progress on Highway 22 over the North Saskatchewan River in Drayton Valley, Alberta, since work on the project began last summer.  Read More //
Jul 19, 2012

Nordahl Road Bridge Enters Phase 2

Flatiron crews have been working nearly around the clock since Feb. 28 on the Nordahl Road project near San Diego, Calif., and have cut the production schedule in half.  Read More //

Page 1 | 2 | 3 ... 8 | 9 | 10 ... 21 | 22 | 23

Admin