Rehabilitating DIA Gate Pavement
Flatiron is working to replace and repair the apron and improve the drainage of the gate pavement around Concourses B and C at Denver International Airport. Crews will remove and replace concrete slabs, restore the original pavement slope to enhance drainage, install additional drains, relocate and rehabilitate designated utilities, provide passenger loading bridge enhancements as required, and other associated apron work in the immediate vicinity.
The project will improve the safety and operation of the concourses by replacing deteriorating pavement, mitigating drainage issues and preventing ponding. There also will be utility work, jet bridge work, and drainage improvements made at several other gates.
Remove and replace concrete slabs at Concourses B and C
Improve and install additional drainage to prevent leakage into concourse basements